Project Details
CLIENT: | New Forest District Council |
LOCATION: | Applemore |
START DATE: | 07/2014 |
COMPLETION DATE: | 10/2014 |
VALUE: | £630,000 |
Refurbishment of the main and learner swimming pools whilst carrying out internal alteration and refurbishment to facilities with centre remaining open throughout. Swimming pool of non-standard construction with ‘hanging’ tank suspended on first floor and plant room below.
– Relocation of existing 2nd floor weights room to ground floor including fit out and redecoration
– Relocation of existing ground floor ‘spin’ room to 2nd floor including fit out and redecoration
– Alteration & redecoration of two studio areas
– Alteration & redecoration to stairs/corridor areas including new doorways
– External refurbishment to building including roof repairs and cladding
– Re-glazing of building
– Complete refurbishment of both pools including re-screeding, waterproofing and re-tiling
– Formation of new spectator area & redecoration of pool hall
– Alteration & refurbishment to wet changing areas
– Repairs, re-rendering & insulated cladding to under side of tank (in plant room)
Works included mechanical & electrical alterations throughout building whilst in use by the public.