Pfizer H-Building Refurbishment

Project Details

CLIENT: Pfizer
LOCATION: Pfizer Havant
START DATE:  09/2016
COMPLETION DATE: 03/2017
VALUE:  £693,000

Enabling works which include site surveys and installation of new full height resistant wall to segregate the project work area from the current GMP areas.

– Installation of temporary hygienic tunnel and further segregation between construction work area which allows GMP personnel to access their work areas without entering any construction areas.

– Alterations/removal of existing packing cubicles

– Mechanical and electrical installation/removal ( including work in the existing plantroom and roof void above the work area)

– Sprinkler installation

– QBMS installation

– Fire compartmentation installation

– Suspended ceiling removal/installation

– Existing floor refurbishment works

– 1st /2nd Fix carpentry works

– Decorations and finishes

– New packaging line installation